Hilti POS 18 -
Hire a total station for a two-man operation.
Item no.: 918314
Hire a total station for a two-man operation.
Setting out positions and levels for excavation and formwork as well as fixing points on floors and ceilings
Specifying attachment points of the vertical plane on facades and walls
Accurate measurement of offsets and slopes
Transfer control lines and points vertically across multiple floor levels
Check and adjust structural components